Get started
ComplianceLive · in the productRegister

NablPrep

ISO 15189 readiness for the lab: each clause’s evidence from the apps that hold it, the gaps with owners, audits and corrective actions.

Installs with LabBridge and IncidentIQ, whose screen it works on · Offered in: India only.
Get NablPrepOpen the appAvailable nowHow pricing works →

What it is

A running answer to what an NABL assessor will ask. The ISO 15189 clauses are listed with a plain summary of what evidence satisfies each. The evidence is linked from where it already lives: SOP versions in PolicyVault, calibration certificates and due dates in AssetPulse, the IQC record in QCBench, EQAS rounds in EQASTrack, competency records in TrainingMatrix, turnaround against each test’s target, and complaints in GrievanceDesk. A calibration stops counting on its due date. A clause is ready when it has current evidence and nothing open against it — no open gap and no open non-conformance — and each section is scored as ready over the clauses that apply; a clause that does not apply must say why. Gaps carry an owner and a date. Internal audits are planned and recorded with their findings; a non-conformity opens a non-conformance with its corrective actions in IncidentIQ, which cannot close while an action is open.

Who uses it
Built for: Every specialty
Reads
SOP versions, calibration certificates and due dates, IQC and EQAS records, competency records, turnaround and complaints
Writes
Evidence links per clause, gaps with owners and dates, internal audits and findings, non-conformances and their corrective actions
Never
It does not certify the lab or stand in for the assessor’s visit, and it does not copy the standard’s text — it keeps the evidence trail an assessor checks.
Access
Only people whose role includes it — the clinic owner decides who
Your data
No PHI. Hosted in Boston, United States. On uninstall: The readiness view stops. Evidence links, gaps and audits are kept; non-conformances stay in IncidentIQ.

How it works

  1. See each clauseEvery ISO 15189 clause with what satisfies it and whether the lab has it now.
  2. Link the evidenceLink the SOP, the calibration certificate, the QC or EQAS record from the app that holds it.
  3. Close the gapsGaps and audit findings get an owner and a date; non-conformances get corrective actions.

Rules it keeps

What it does not do, by design. A listing with only benefits is an advertisement.

It does not certify the lab or stand in for the assessor’s visit, and it does not copy the standard’s text — it keeps the evidence trail an assessor checks.

AI in NablPrep

AskQuestions about what is on screen — “What needs attention in NablPrep today?” — answered with the records it read.
DraftSummaries and notes for the team, marked as drafts until a person signs.
Every answer shows its sources. Nothing AI writes is saved until a person accepts it.

See it on screen

Live product
01NABL — Get the lab ready for NABL: evidence per clause, gaps, audits and corrective actionsCaptured from the running demo clinic
NablPrep — NABL — Get the lab ready for NABL: evidence per clause, gaps, audits and corrective actions
1 of 1

Connected to

Read out of the code, not the brochure: each app below is here because one service queries the other’s tables. Install either side and the hand-over is already wired.

Hands to · 2
See the whole clinic →

Questions clinics ask

What does NablPrep do?
ISO 15189 readiness for the lab: each clause’s evidence from the apps that hold it, the gaps with owners, audits and corrective actions. A running answer to what an NABL assessor will ask. The ISO 15189 clauses are listed with a plain summary of what evidence satisfies each. The evidence is linked from where it already lives: SOP versions in PolicyVault, calibration certificates and due dates in AssetPulse, the IQC record in QCBench, EQAS rounds in EQASTrack, competency records in TrainingMatrix, turnaround against each test’s target, and complaints in GrievanceDesk. A calibration stops counting on its due date. A clause is ready when it has current evidence and nothing open against it — no open gap and no open non-conformance — and each section is scored as ready over the clauses that apply; a clause that does not apply must say why. Gaps carry an owner and a date. Internal audits are planned and recorded with their findings; a non-conformity opens a non-conformance with its corrective actions in IncidentIQ, which cannot close while an action is open.
What data does NablPrep read and write?
NablPrep reads SOP versions, calibration certificates and due dates, IQC and EQAS records, competency records, turnaround and complaints and writes evidence links per clause, gaps with owners and dates, internal audits and findings, non-conformances and their corrective actions. Its data class is No PHI. Every app works on the same patient record — nothing is copied into a silo.
What does NablPrep deliberately not do?
It does not certify the lab or stand in for the assessor’s visit, and it does not copy the standard’s text — it keeps the evidence trail an assessor checks.
What happens to our data if we uninstall NablPrep?
The readiness view stops. Evidence links, gaps and audits are kept; non-conformances stay in IncidentIQ.
Is NablPrep available today?
Yes — NablPrep is live in clinics today. Set up your practice on MedAppz and install it from your dashboard.
Where is NablPrep offered?
NablPrep is offered in India only: it is built on that market's own systems and rules.

Want to see NablPrep running on your own patients?

Tell us what you run and we will show you this app inside a practice shaped like yours — or answer the question the page above did not.

We use your name, phone number and clinic name for one thing: to answer this enquiry about MedAppz. It is stored on our own server, in the single region our trust centre names, and it is not sold or passed to anyone else.

Email us

You can withdraw either at any time: write to hello@medappz.com, or tell whoever calls you, and we will delete what you gave us.

More in Compliance

All 139 →
Featured inDiagnostics QA stack